RUST ZERG LIFEClan war room · live
No limit8 · game default
Deployment dossierOffline

MS Project | SOLO/DUO

80.221.91.195:28015 checked 11d ago

moddedcarbon
Deploy
Zerg meter0%empty
0/25 troops
7-day average0
peak –
Rank#15,948
top 70%
Last wipe17d ago
no schedule published
Next wipe · H-hour–
too few wipes seen yet

Players

No hourly history yet.

Hourly average and peak, UTC.

Server performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep24 Sep28 Sep1 Oct5 Oct9 Oct

Top 70% of all ranked servers. Ranked on player hours over the last seven days.

Wipe schedule

too few wipes seen yet

Not enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.

usual gap8.5 days
between real wipes
wipe-day peak1
players, last three wipes
crowd held0%
else halves by day 1

The first 48 hours of its last wipes

Sat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Sat 26 Sep, 09:07 UTC17d ago 1 – running 1
Thu 17 Sep, 20:03 UTC26d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Similar servers

the same kind of game, then region, group limit, rate and wipes
Zergmax 16
RETRO RUST #1 Х1000|NOLIMIT|LOOT++|KIT WIPE 13.10 EU · groups of 16+ · weekly · 109 on average
25/245
No limit8 · game default
МИНИ-КАРТА 2Х | STORM | FPS+ 10.10 EU · groups of 8+ · weekly · 90 on average
89/100
Zergmax 16
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 10.10 EU · groups of 16+ · monthly · 85 on average
11/1000
Zergmax 16
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РОССИЯ 08.10 EU · groups of 16+ · monthly · 76 on average
3/1000
Zergmax 16
404 RUST 2Х|ДЛЯ НОВИЧКОВ|EU MAIN 11.10 EU · groups of 16+ · monthly · 74 on average
11/700
Zergmax 30
SURVIVORS.GG | 2 x Vanilla | Monthly groups of 30+ · monthly · 72 on average
19/200

Quick answers

from the figures on this page

Server rules

What settings does MS Project | SOLO/DUO run?

There is no gather rate in the name MS Project | SOLO/DUO. That is the game's default: groups of up to 8 players. It runs survival, gather, build, raid: the regular game. Other players can be fought and raided. The server browser lists it under Modded: the game is changed by plugins or settings. It runs plugins: Carbon. VAC, Valve's anti-cheat, is switched on.

What is the map on MS Project | SOLO/DUO?

A procedural map, size 3,500 with seed 789936933, generated by the game, is what MS Project | SOLO/DUO runs. From this page, RustMaps can show it: size and seed produce the same map each time.

Player count

How full is MS Project | SOLO/DUO?

At present, MS Project | SOLO/DUO is offline and its last appearance was 11 days 4 hours ago.

What is MS Project | SOLO/DUO's ranking?

In the top 70% of ranked servers, MS Project | SOLO/DUO holds #15,948 for player hours over the last seven days.

Tags and filters

How should you read the tags on MS Project | SOLO/DUO?

For the game's server browser, MS Project | SOLO/DUO publishes these tags: gmrust (Game mode): Standard survival gameplay; mp25 (Max players): Capacity: 25; ts8 (Group limit): Teams max out at 8—the default setting for Rust; v2633 (Protocol): Protocol 2633—only players on that version can get in; cs162929 (Build): The game build is 162929; ptrak (Networking): Standard RakNet networking is in use here; $r? (Region code): Region code left unset; ^z (Modded): Modded category: the game is altered by plugins or settings; ^y (Carbon): This server uses Carbon for plugins. The tags carry its players now, its queue and the time its world was made as well, and the top of this page displays them.

Which Rust Zerg Life filters and lists cover MS Project | SOLO/DUO?

Modded Rust servers for clans and zergs: that is where you will find MS Project | SOLO/DUO among the Rust Zerg Life rankings. These filters bring it up on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.

Server details

Is MS Project | SOLO/DUO currently online and stable?

MS Project | SOLO/DUO is offline at the moment; the last time it was seen was 11 days 4 hours ago. Across the last 7 full days, 0 of 168 hours were online, which is 0%. Its first appearance in Rust Zerg Life records is 13 September 2026.

What version is MS Project | SOLO/DUO using?

On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. Joining requires your game to be on the same protocol, which Steam updates automatically.

Where can you find MS Project | SOLO/DUO?

From MS Project | SOLO/DUO, no region is published. The location shown by Rust Zerg Life is what a server says; it does not check where the machine stands. You can reach it at 80.221.91.195:28015.

Wipe days

What can you expect on wipe day on MS Project | SOLO/DUO?

The average peak for its recent wipes was 1 players. On the latest wipe, 0 hours after the wipe, the crowd hit its peak. The crowd kept above half that peak until the next wipe in 0% of its recent wipes. If not, the crowd fell below half by day 1.

How often does MS Project | SOLO/DUO wipe, and on what days?

So few of MS Project | SOLO/DUO's wipes are recorded that its rhythm cannot be told yet. Next on Thursday 5 November at 19:00 UTC: the monthly force wipe that every Rust server gets. The world it is running now dates from 17 days 15 hours ago.

Connect

What steps do I take to join MS Project | SOLO/DUO?

You can join by opening the console with F1 and typing client.connect 80.221.91.195:28015. Or hit Launch Rust on this page to open Rust through Steam and connect.

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Standard survival gameplay.
mp25
Max players Capacity: 25.
ts8
Group limit Teams max out at 8—the default setting for Rust.
v2633
Protocol Protocol 2633—only players on that version can get in.
cs162929
Build The game build is 162929.
ptrak
Networking Standard RakNet networking is in use here.
$r?
Region code Region code left unset.

Mods and access

^z
Modded Modded category: the game is altered by plugins or settings.
^y
Carbon This server uses Carbon for plugins.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.